| United States-English |
|
|
|
![]() |
hp Carrier Grade Blade Server bh3710 Site Preparation GuideChapter 2 General System and Facility Guidelines |
|
Table of Contents This chapter provides general computer facility guidelines for planning and preparing the site. Careful site planning and preparation ensures trouble-free installation and reliable operation of HP Blade Servers. Factors that may contribute to less than optimal equipment operation are also highlighted. Refer to Table A-3 “Power Consumption and Air Conditioning Requirement Summary” for more information on guidelines specific to the Blade Server.
Throughout this chapter, the
symbol will be used to indicate Local Authority Has Jurisdiction. |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||