hp Carrier Grade Blade Server bh3710 Site Preparation Guide > Chapter 2 General System and Facility GuidelinesEnvironmental Factors |
|
The environmental factors discussed in this section are: The following guidelines are recommended when preparing a computer room for a HP server:
This section contains information about space requirements for a HP server. This data should be used as the basic guideline for space plan developments. Other factors, such as airflow, lighting, and equipment space requirements must also be considered. There should be enough clearance to move equipment safely from the receiving area to the computer room. Permanent obstructions, such as pillars or narrow doorways, can cause equipment damage. Delivery plans should include the possible removal of walls or doors. The physical dimensions for applicable computers and peripheral equipment are summarized in Appendix A “System Specifications and Requirements” Other factors must be considered along with the basic equipment dimensions. Reduced airflow around equipment causes overheating, which can lead to equipment failure. Therefore, the location and orientation of air conditioning ducts, as well as airflow direction, are important. Obstructions to equipment intake or exhaust airflow must be eliminated. The locations of lighting fixtures and utility outlets affect servicing operations. Plan equipment layout to take advantage of lighting and utility outlets. Do not forget to include clearance for opening and closing equipment doors. Clearance around and above the cabinets must be provided for proper cooling airflow through the equipment. The service area space requirements, outlined in Appendix A, are minimum dimensions. If other equipment is located so that it exhausts heated air near the cooling air intakes of the computer system cabinets, larger space requirements are needed to keep ambient air intake to the computer system cabinets within the specified temperature and humidity ranges. Space planning should also include the possible addition of equipment or other changes in space requirements. Equipment layout plans should also include provisions for the following:
A floor plan grid is helpful for planning the location of equipment in the computer room. In addition to its use for planning, a floor plan grid should also be considered when planning the locations of the following items:
The computer room floor must be able to support the total weight of the installed computer system as well as the weight of the individual cabinets as they are moved into position. Floor loading is usually not an issue in nonraised floor installations. The information presented in this section is directed toward raised floor installations.
Raised floor loading is a function of the manufacturer's load specification and the positioning of the equipment relative to the raised floor grid. While Hewlett-Packard cannot assume responsibility for determining the suitability of a particular raised floor system, it does provide information and illustrations for the customer or local agencies to determine installation requirements. The following guidelines are recommended:
The table below defines floor-loading terms: Table 2-1 Floor Loading Term Definitions
Air conditioning equipment requirements and recommendations are described in the following sections. Appendix A “System Specifications and Requirements” summarizes air conditioning requirements for this HP server. The cooling capacity of the installed air conditioning equipment for the computer room should be sufficient to offset the computer equipment dissipation loads, as well as any space envelope heat gain. This equipment should include:
Lighting and personnel must also be included. For example, a person dissipates about 450 Btus per hour while performing a typical computer room task. At altitudes above 10,000 feet (3048 m), the lower air density reduces the cooling capability of air conditioning systems. If your facility is located above this altitude, the recommended temperature ranges may need to be modified. For each 1000 feet (305 m) increase in altitude above 10,000 feet (up to a maximum of 15,000 feet), subtract 1.5 F (0.83 C) from the upper limit of the temperature range specified for this HP server. The following guidelines are recommended when designing an air conditioning system and selecting the necessary equipment:
The following three air conditioning system types are listed in order of preference:
A basic air distribution system includes supply air and return air. An air distribution system should be zoned to deliver an adequate amount of supply air to the cooling air intake vents of the computer system equipment cabinets. Supply air temperature should be maintained within the following parameters:
The following three types of air distribution system are listed in order of recommendation:
All air conditioning equipment, materials, and installation must comply with any applicable construction codes. Installation of the various components of the air conditioning system must also conform to the air conditioning equipment manufacturer's recommendations. Use separate computer room air conditioning ductwork. If it is not separate from the rest of the building, it might be difficult to control cooling and air pressure levels. Ductwork seals are important for maintaining a balanced air conditioning system and high static air pressure. Adequate cooling capacity means little if the direction and rate of air flow cannot be controlled because of poor duct sealing. Also, the ducts should not be exposed to warm air, or humidity levels may increase. Maintain recommended humidity level at 40 to 60% RH. High humidity causes galvanic actions to occur between some dissimilar metals. This eventually causes a high resistance between connections, leading to equipment failures. High humidity can also have an adverse affect on some magnetic tapes and paper media.
Low humidity levels are often the result of the facility heating system and occur during the cold season. Most heating systems cause air to have a low humidity level, unless the system has a built-in humidifier. Computer equipment can be adversely affected by dust and microscopic particles in the site environment. Specifically, disk drives, tape drives, and some other mechanical devices can have bearing failures resulting from airborne abrasive particles. Dust may also blanket electronic components like printed circuit boards causing premature failure due to excess heat and/or humidity build up on the boards. Other failures to power supplies and other electronic components can be caused by metallically conductive particles, including zinc whiskers. These metallic particles are conductive and can short circuit electronic components. Use every effort to ensure that the environment is as dust and particulate free as possible. See following heading titled “Metallic Particulate Contamination” for additional details. Smaller particles can pass though some filters and over a period of time, cause problems in mechanical parts. Small dust particles can be prevented from entering the computer room by maintaining the air conditioning system at a high static air pressure level. Other sources of dust, metallic, conductive, abrasive, and/or microscopic particles can be present. Some sources of these particulates are:
These particulates are not always visible to the naked eye. A good check to determine their possible presence is to check the underside of the tiles. The tile should be shiny, galvanized, and free from rust. The computer room should be kept clean. The following guidelines are recommended:
Special precautions are necessary if the computer room is near a source of air pollution. Some air pollutants, especially hydrogen sulfide (H2S), are not only unpleasant but corrosive as well. Hydrogen sulfide damages wiring and delicate sound equipment. The use of activated charcoal filters reduces this form of air pollution. Metallic particulates can be especially harmful around electronic equipment. This type of contamination may enter the data center environment from a variety of sources, including but not limited to raised floor tiles, worn air conditioning parts, heating ducts, rotor brushes in vacuum cleaners or printer component wear. Because metallic particulates conduct electricity, they have an increased potential for creating short circuits in electronic equipment. This problem is exaggerated by the increasingly dense circuitry of electronic equipment. Over time, very fine whiskers of pure metal can form on electroplated zinc, cadmium, or tin surfaces. If these whiskers are disturbed, they may break off and become airborne, possibly causing failures or operational interruptions. For over 50 years, the electronics industry has been aware of the relatively rare but possible threat posed by metallic particulate contamination. During recent years, a growing concern has developed in computer rooms where these conductive contaminants are formed on the bottom of some raised floor tiles. Although this problem is relatively rare, it may be an issue within your computer room. Since metallic contamination can cause permanent or intermittent failures on your electronic equipment, Hewlett-Packard strongly recommends that your site be evaluated for metallic particulate contamination before installation of electronic equipment. Static charges (voltage levels) occur when objects are separated or rubbed together. The voltage level of a static charge is determined by the following factors:
Follow these static protection measures to minimize possible ESD-induced failures in the computer room:
Computer equipment and air conditioning blowers cause computer rooms to be noisy. Ambient noise level in a computer room can be reduced as follows:
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||