Sample Site Inspection Checklist

» 

Technical documentation

Complete book in PDF
» Feedback
Content starts here

 » Table of Contents

 » Glossary

 » Index

Table 3-4 Customer and Hewlett-Packard Information

Customer Information
Name:Phone No:
Street Address:CityorTown
State or Province:Country:
Zip or postal code: 
Primary customer contact:Phone No.:
Secondary customer contact:Phone No.:
Traffic coordinator:Phone No.:
Hewlett-Packard information
Sales representative:Order No:
Representative making survey:Date:
Scheduled delivery date: 

 

Table 3-5 Site Inspection Checklist

Please check either Yes or No. If No, include comment# or dateComment or Date
Computer room
No.Area or conditionYesNo 
1.Is there a completed floor plan?   
2.Is there adequate space for maintenance needs?Front 36 in. (91.4 cm) minimum, rear 36 in. (91.4 cm) minimum are recommended clearances.   
3.Is there adequate space for access to overhead cable trough(s)?   
4.Is access to the site or computer room restricted?   
5.Is the computer room structurally complete?Expected date of completion?   
6.Is a raised floor installed and in good condition?   
7.Are floor tiles in good condition and properly braced?   
8. Is the raised floor adequate for equipment loading?   
9.Are there channels, cutouts or overhead cable trough(s) for cable routing?   
10.Is a telephone line available for servicing needs?   
11.Are customer supplied peripheral cables and LAN cables available and of the proper type?   
12.Is floor tile underside shiny or painted? If painted, judge the need for metallic particulate test.   
Power and lighting
No.Area or conditionYesNo 
13.Are lighting levels adequate for maintenance?   
14.Does the DC input voltage correspond to equipment specifications?   
14AIs dual source DC power used? If so, identify type(s) and evaluate grounding.   
15.Is a NEBS compliant DC power source available?   
16.Is there a dedicated branch circuit for equipment?   
17.Are the input circuit breakers adequate for equipment loads?   
Safety
No.Area or conditionYesNo 
18.Is there an emergency power shut-off switch?   
19.Is there a telephone available for emergency purposes?   
20.Is there a fire protection system in the computer room?   
21.Is antistatic flooring installed?   
22.Are there any equipment servicing hazards (loose ground wires, poor lighting, and so on)?   
Cooling
No.Area or conditionYesNo 
23.Can cooling be maintained between 5°C and 40°C (up to 5,000 ft)? Derate 1°C/1,000 ft above 5,000 ft and up to 10,000 ft.   
24.Can temperature changes be held to 10°C per hour with tape media? Can temperature changes be held to 20°C per hour without tape media?   
25.Can humidity level be maintained at 40% to 55% (non condensing)?   
26.Are air conditioning filters installed and clean?   
Storage
No.Area or conditionYesNo 
27.Are cabinets available for tape and disc media?   
28.Is shelving available for documentation?   
Training
No.Area or ConditionYesNo 
29.Are personnel enrolled in the System Administrator’s Course?   
30.Is on-site training required?   

 